Pre-Engineered Metal Kits and Custom Metal Buildings

When steel is part of the scope, experience matters. Decisions made early—about materials, sequencing, and responsibilities—directly impact the schedule and downstream trades.

Titan Construction works with commercial contractors across East Texas to provide steel supply and erection as a single, coordinated package.

Whether the project calls for a prefab approach or a fully custom metal building, our role is to execute the steel work correctly, integrate seamlessly with the schedule, and hand over a structure that’s ready for what comes next.

Schedule a Steel Consultation

PEMB & Custom Steel—Executed Without Schedule Surprises

Whether you’re using PEMB or fully custom steel, Titan executes the scope with clear sequencing, clean coordination, and defined responsibilities, so steel doesn’t become an issue downstream.

Pre-Engineered Commercial Metal Buildings

Erect prefabricated steel systems efficiently while maintaining schedule control and jobsite coordination.

Custom Commercial Steel Buildings

Execute fully custom steel structures aligned to drawings, site conditions, and construction sequencing.

Clear Span Commercial Buildings

Install clear span steel buildings that maximize interior space without interior columns or obstructions.

Titan Construction Answers Your Questions About Our Supply & Erect Services

Supply and erect means Titan sources the steel and completes the erection under one scope, reducing coordination risk and simplifying responsibility.

Yes. We can erect General Contractor-selected or Owner-specified steel packages, or source and manage the steel package as part of our supply scope.

Managing supply and erection together allows better sequencing, fewer delays between delivery and install, and clearer schedule accountability.

Titan serves as the central point of coordination—working with engineers, steel detailers, and suppliers to review drawings, resolve conflicts, and keep fabrication and erection on schedule.

Early involvement allows Titan to review drawings, identify sequencing concerns, and help avoid steel-related delays later in construction.

Yes. Titan supports a range of commercial projects, from smaller steel structures to large, complex commercial and industrial buildings.

We Make It Easy to Erect Steel Buildings


Schedule Steel Erection

1

Coordinate

Titan aligns engineering review, detailing, shop drawings, procurement, and scheduling early to prevent conflicts, gaps, and change orders.

2

Supply & Erect

We furnish the steel and control erection sequencing, safety, and trade coordination to reduce delays and field issues.

3

Deliver

You get an inspection-ready steel structure that keeps downstream trades on schedule and protects the overall build timeline.

Yes. Titan regularly erects owner-furnished or GC-selected steel packages and installs them strictly per the approved documents.

Erection only covers field installation of owner- or GC-supplied structural steel, including unloading, setting, bolting and welding, and alignment per approved drawings and erection plans.

Material procurement, steel detailing, engineering, fabrication, and freight coordination are excluded unless specifically added by contract.

Early involvement allows Titan to review schedules, crane access, and sequencing to identify potential conflicts before steel arrives on site.

Yes. Titan coordinates erection sequencing, crane activity, and field logistics with adjacent trades to avoid interference and keep installation moving safely and swiftly.

Yes. Titan erects steel from approved, released shop drawings to reduce errors, rework, and inspection issues.