Not every metal building fits a factory template.
Weld-up fabrication involves cutting, fitting, and welding components in the field, allowing designs to adapt to real-world conditions as the structure takes shape.
Titan Construction provides weld-up steel erection using experienced crews who follow engineered drawings, approved procedures, and applicable inspection requirements. The result is a custom-built steel structure erected safely, accurately, and with clear responsibility from start to finish.
Weld-up fabrication is ideal for—barndominiums, workshops, and small-scale commercial buildings—projects that benefit from hands-on construction and field-fit precision.

Complete on-site structural welding using professional welders and approved welding procedures aligned with project drawings and specifications.

Support non-standard layouts, custom dimensions, and design details commonly found in shops, barndominiums, and small business structures.
Complete weld-up erection projects within a defined scope so inspections, coordination, and next steps move forward without confusion or rework.
Weld-up fabrication is commonly used for custom shops, barndominiums, agricultural buildings, and small commercial structures where flexibility and customization are priorities.
Pre-engineered buildings are factory-produced and standardized. Weld-up fabrication allows more customization in the field, making it well suited for unique layouts or site-specific conditions.
It can. Weld-up projects may require inspections depending on design and jurisdiction. Titan plans for these requirements as part of the erection process.
Yes. Many projects include both bolted and welded connections. Titan Construction executes each per approved drawings and specifications.
Early involvement helps review access, sequencing, welding requirements, and inspection needs before erection begins.
Confirm approved drawings, welding requirements, permitting considerations, access, and sequencing before erection begins.
Assemble steel and complete required on-site welding per engineered plans and approved procedures.
Deliver an inspection-ready steel structure to keep downstream work on schedule.